Skip to content
PinnacleEnergy Technologies

Technology

The Circuit Management System

Model the system, validate every circuit, then monitor and alert in real time.

Four stages, one connected system

01

Model

A digital model of the distribution system, built from facility down to the individual circuit.

02

Validate

Every circuit checked automatically against NEC ampacity and equipment limits.

03

Monitor

Live amperage and voltage tracked continuously across the entire network.

04

Alert

Trips and near-trips escalated the moment they happen, with full circuit context.

Structured to match the physical system

Each level is defined once and nests into the next, building a structured digital model of your distribution network.

Access follows the same structure. Organizations are fully isolated, and role-based permissions control who sees each facility and each circuit.

FacilityL1
SubstationL2
Distribution BoardL3
PanelL4
CircuitL542.7 A

Every circuit validated against the NEC

Load and conductor data are checked automatically, returning an instant pass / fail verdict and a recommended breaker for every circuit.

NEC 310.15

Ampacity

NEC-validated final ampacity determined through conductor insulation, size, and temperature ratings.

Design current

Voltage Drop

Voltage drop and resulting end voltage evaluated against acceptable limits.

NEC 240.4 · 240.6

Breaker Sizing

A recommended overcurrent device returned for the validated circuit.

NEC Validation

Panel B-4 · Circuit 12

PASS
Conductor
6 AWG Cu · THHN · 75°C
Run length
120 ft
Connected load
42 A · continuous
Final ampacity (derated)
52 A
Voltage drop
within limits2.8%
Recommended breaker
50 A

NEC 2023 · 310.15 · 240.4 · 240.6

Continuous monitoring, instant escalation

Live Monitoring

Per-circuit current, voltage, and threshold readings across a facility-wide tree view, from substation to circuit, with real-time trend charts for any circuit under watch.

Alerts & Escalation

Trips and near-trips flagged instantly, with per-circuit thresholds, acknowledge-to-resolve tracking, and a fleet-wide view across all facilities.

SMS · on-call rotation

⚠ NEAR TRIP — Panel B-4 / Circuit 12 at 47.6 A (95% of 50 A breaker). Acknowledge: pinnacleenergy.cloud/alerts

Delivered · seconds after detection

Built to fit your infrastructure

Hardware agnostic

Compatible metering and sensing hardware connects directly. Where new hardware is needed, we configure and install it with your team.

Enterprise access control

Multi-tenant isolation with role-based permissions per organization and facility.

History retained

Hourly readings are kept indefinitely, so you can audit any circuit's history and plan loads against real data.

Seconds to escalation

Threshold checks run continuously. Alerts reach the right people in seconds.

Request a demonstration